| Work Order Report |
| Locatio | WO # | | District | | Project | | Task | | Dept/Div |
| OAK HARBOR BLVD | R09J090 | | 223243 | | 12 | | | | 1535 |
| Date | 04 / 17 / 15 | | Requested By | RAY SINGLETARY | Description | CATCH BASIN/GRATE | Status | FINALLED |
| Remarks/Instructions | CHECK DRAINAGE AND CLEAN CATCHBASIN AREA |
| OAK HARBOR BLVD | R09J090 | | 223221 | | 12 | | | | 1535 |
| Date | 04 / 16 / 15 | | Requested By | MARC CRAWFORD | Description | PROTECTIVE MEASURES | Status | FINALLED |
| Remarks/Instructions | INSTALL BARRICADES ON BLVD. |
| OAK HARBOR BLVD | R09J090 | | 223124 | | 12 | | | | 1535 |
| Date | 04 / 14 / 15 | | Requested By | MARC CRAWFORD | Description | CATCH BASIN/GRATE | Status | FINALLED |
| Remarks/Instructions | CATCH BASIN NOT DRAINING, BY THE EXXON GAS STATION |
| OAK RIDGE AVE DITCH | D09GW01 | | 222135 | | 12 | | | | 1510 |
| Date | 04 / 07 / 15 | | Requested By | SHANNON DAVIS | Description | DITCH LATERAL REVIEW | Status | COMPLETED AND |
| Remarks/Instructions | 2015 ANNUAL LATERAL INSPECTION |
| ROYAL OAK ST DITCH | D09HW02 | | 222165 | | 12 | | | | 1510 |
| Date | 04 / 07 / 15 | | Requested By | SHANNON DAVIS | Description | DITCH LATERAL REVIEW | Status | COMPLETED AND |
| Remarks/Instructions | 2015 ANNUAL LATERAL INSPECTION |
| Monday, May 04, 2015 | Page 2 of 2 |