Work Order Summary Report

Locatio WO #
District
Project
Task
Dept/Div

LAKE VILLAGE BLVD R08L026
291577
08
1535

Date 12 / 20 / 17
Requested By RAY SINGLETARY Description CATCH BASIN/GRATE Status COMPLETED AND

Remarks/Instructions CLEAN AND CHECK CATCH BASINS IN LAKE VILLAGE AREA

LENWOOD DR POND P08IW011
290956
08
1530

Date 12 / 12 / 17
Requested By LOUIS BURNETT Description MISCELLANEOUS Status REQUESTED

Remarks/Instructions PUMP MAINT.

N PEARL DR BRIDGE B08L016
290893
08
1535

Date 12 / 08 / 17
Requested By SHANNON DAVIS Description PROTECTIVE MEASURES Status FINALLED

Remarks/Instructions SAND BRIDGES

NAPLES CT R08H048
291246
08
1530

Date 12 / 18 / 17
Requested By MACALUSO, BRYAN Description PATCHING Status REQUESTED

Remarks/Instructions POTHOLE PATCHING.

NORTHWOOD DR R08I030
290504
08
15055

Date 12 / 04 / 17
Requested By COUNCIAL OFFICE/MAIL Description SIGN REMOVAL Status COMPLETED AND

Remarks/Instructions REMOVE HANDI CAP SIGNS.** CONFIRMED FROM REQUESTER HAS MOVED

NORTHWOOD DR R08I030
290948
08
1530

Date 12 / 12 / 17
Requested By LOUIS BURNETT Description CATCH BASIN/GRATE Status REQUESTED

Remarks/Instructions CLEAR CATCH BASINS OPEN DRAINAGE

ONYX AVE R08L011
291614
08
1535

Date 12 / 20 / 17
Requested By RAY SINGLETARY Description GRASS CUTTING Status COMPLETED AND

Remarks/Instructions CUT GRASS WITH SIDE MOWER

PAWNS LN R08I066
290952
08
1530

Date 12 / 12 / 17
Requested By LOUIS BURNETT Description CATCH BASIN/GRATE Status REQUESTED

Remarks/Instructions CLEAR CATCH BASINS OPEN DRAINAGE

RUBY ST R08L013
291609
08
1535

Date 12 / 20 / 17
Requested By RAY SINGLETARY Description GRASS CUTTING Status COMPLETED AND

Remarks/Instructions CUT GRASS WITH SIDE MOWER

SERVICE RD BRIDGE B08L120
290891
08
1535

Date 12 / 08 / 17
Requested By SHANNON DAVIS Description PROTECTIVE MEASURES Status FINALLED

Remarks/Instructions SAND BRIDGES

SILVER MAPLE DR R08I087
290950
08
1530

Date 12 / 12 / 17
Requested By LOUIS BURNETT Description CATCH BASIN/GRATE Status REQUESTED

Remarks/Instructions CLEAR CATCH BASINS OPEN DRAINAGE

Wednesday, January 03, 2018 Page 3 of 4
First Previous Next Last