Work Order Summary Report

Locatio WO #
District
Project
Task
Dept/Div

MAINEGRA RD R09H011
278884
12
1510

Date 06 / 21 / 17
Requested By KATO PICHON Description PROTECTIVE MEASURES Status IN PROGRESS

Remarks/Instructions PLACE HIGH WATER SIGNS

MAINEGRA RD R09H011
279510
12
1510

Date 06 / 15 / 17
Requested By KATO PICHON Description DITCH ROAD CLEAN Status REQUESTED

Remarks/Instructions DITCHES NEED DIGGING (ROUTINE CLEANING)

MAINEGRA RD DITCH D09HW01
277747
12
1510

Date 06 / 09 / 17
Requested By KATO PICHON Description DITCH LAT. CLEAR ROW Status COMPLETED AND

Remarks/Instructions BIG DITCH NEED TO BE CLEANED

MARY DR R08K007
278340
12
1535

Date 06 / 15 / 17
Requested By KELLER, PAT Description DITCH ROAD CLEAN Status REQUESTED

Remarks/Instructions DITCHES NEED DIGGING DRAINAGE PROBLEM AND SURROUNDING AREA

NELLIE DR R08K006
278923
12
1535

Date 06 / 22 / 17
Requested By KELLY, PATRICK Description DITCH LATERAL CLEAN Status REQUESTED

Remarks/Instructions LATERAL DITCH NEED DIGGING DRAINAGE PROBLEM(PLEASE CALL)

NELLIE DR R08K006
279404
12
1535

Date 06 / 22 / 17
Requested By KELLY, PATRICK Description TREE REMOVAL Status REQUESTED

Remarks/Instructions CUT PINE TREE LEANING TOWARD HOUSE

NUEVO ST R09J066
277548
12
1535

Date 06 / 06 / 17
Requested By RAY SINGLETARY Description CULVERT CLEANOUT Status FINALLED

Remarks/Instructions CLEAN CULVERTS AND AREA

OAK HARBOR BLVD R09J090
277641
12
1535

Date 06 / 06 / 17
Requested By RAY SINGLETARY Description CATCH BASIN/GRATE Status FINALLED

Remarks/Instructions CLEAN CATCH BASIN AND AREA

OAK HARBOR BLVD R09J090
278985
12
1535

Date 06 / 22 / 17
Requested By RAY SINGLETARY Description CATCH BASIN/GRATE Status FINALLED

Remarks/Instructions CHECK AND CLEAN CATCH BASINS IN AREA

OAK HARBOR BLVD R09J090
279405
12
1535

Date 06 / 26 / 17
Requested By RAY SINGLETARY Description CUT LIMBS Status FINALLED

Remarks/Instructions PICK UP LIMBS IN ROADWAY

OAK HARBOR BLVD R09J090
279486
12
1535

Date 06 / 29 / 17
Requested By RAY SINGLETARY Description COLD MIX Status FINALLED

Remarks/Instructions PATCH HOLES IN ROAD

Wednesday, July 05, 2017 Page 3 of 4
First Previous Next Last