Work Order Report

Locatio WO #
District
Project
Task
Dept/Div

CAREY RD R08A036
221060
09


1540

Date 03 / 23 / 15
Requested By SCOTTY KINCHEN Description PATCHING Status REQUESTED

Remarks/Instructions PATCH POTHOLES

CLEO RD DITCH D08HW01
219769
09


1530

Date 03 / 12 / 15
Requested By SHANNON DAVIS Description DITCH LATERAL REVIEW Status REQUESTED

Remarks/Instructions 2015 ANNUAL LATERAL DITCH REVIEW

CLEO RD DITCH D08HW02
219773
09


1530

Date 03 / 12 / 15
Requested By SHANNON DAVIS Description DITCH LATERAL REVIEW Status REQUESTED

Remarks/Instructions 2015 ANNUAL LATERAL DITCH REVIEW

COBB HAMMOCK RD R08C002
219376
09


1530

Date 03 / 06 / 15
Requested By LOUIS BURNETT Description GRASS CUTTING Status COMPLETED AND

Remarks/Instructions SIDE MOW

CROSS GATES BLVD R08L001
220294
09


1535

Date 03 / 13 / 15
Requested By RAY SINGLETARY Description MISCELLANEOUS SIGNS Status REQUESTED

Remarks/Instructions SIGN MAINT. IN AREA [NEW CROSS GATES]

CROSS GATES BLVD R08N001
219648
09


1535

Date 03 / 09 / 15
Requested By RAY SINGLETARY Description CATCH BASIN/GRATE Status COMPLETED AND

Remarks/Instructions CHECK AND CLEAN CATCHBASIN IN AREA

CROSS GATES BLVD R08L001
221130
09


1535

Date 03 / 16 / 15
Requested By RAY SINGLETARY Description CATCH BASIN/GRATE Status REQUESTED

Remarks/Instructions CHECK AND CLEAN CATCH BASINS

CROSS GATES BLVD R08L001
219609
09


1535

Date 03 / 06 / 15
Requested By COUNCIL OFFICE Description SIGN REPLACEMENT Status FINALLED

Remarks/Instructions REPAIR STOP SIGN @ EPSOM

CROSS GATES BLVD R08N001
220278
09


1535

Date 03 / 13 / 15
Requested By RAY SINGLETARY Description MISCELLANEOUS SIGNS Status COMPLETED AND

Remarks/Instructions SIGN MAINT. IN AREA [OLD CROSS GATES]

CROSS GATES BLVD R08L001
219667
09


1535

Date 03 / 10 / 15
Requested By COUNCIL OFFICE Description SINK HOLE PERM. REP. Status REQUESTED

Remarks/Instructions SINK HOLE ON THE EDGE OF ROADWAY AND BY THE MAN HOLE

CROSS GATES BLVD R08N001
220862
09


1535

Date 03 / 18 / 15
Requested By THONN, SYLVIA Description DITCH ROAD CLEAN Status REQUESTED

Remarks/Instructions DITCHES NEED DIGGING DRAINAGE PROBLEM

Tuesday, March 31, 2015 Page 3 of 14
First Previous Next Last